    A description is provided of the legal/regulatory situation, as of early December 2021, for CO2 transport from Sweden/Preem AB to Norway/Northern Lights. CO2 transport from Sweden to Norway for the purpose of geological storage under the seabed is since 2019 legal, thanks to the provisional...
 
    Eramet Norway Sauda, Hydro, Gassco/Equinor and Haugaland Næringspark (HNP) have joined forces in a CCS cluster to evaluate benefits from cooperating on transport of captured CO2 to a storage terminal. Total CO2 emissions in the cluster were in 2022 1.5 million tonnes, which can be expected to...
 
    The CCS Midt-Norge project phase 1 has been a collaboration between Franzefoss Minerals, Statkraft Varme, Elkem Thamshavn, Wacker Holla Metall, Equinor Tjelbergodden and SINTEF. CO2 emissions from the industries in the project are around 1.5 Mt/year. Power consumption for capturing and liquefying...
 
    Rapporten gjør en etterevaluering av en investering på 1,7 milliarder (løpende kroner) i nytt togradiosystem (GSM-R) i Norge i perioden 2003-2008. Kriteriene er produktivitet i utbyggingsfasen, effekter av investeringen (måloppnåelse), ytterligere virkninger, fortsatt relevans, løsningens...
 
    Denne rapporten oppsummerer funn og analyse fra CLIMIT idéstudie «Haugaland CCS». Studiet har tatt utgangspunkt i hydrogenproduksjon fra naturgass med CO2-fangst ved Haugaland Næringspark, og kartlagt potensiell regional bruk av hydrogen i tillegg til stor-skala eksport. Hydrogen for avkarbonisert...