Til hovedinnhold
Norsk English

Long-term hydro-thermal scheduling including network constraints

Sammendrag

This paper presents a method for treating transmission network bottlenecks in a stochastic hydro-thermal scheduling model. The model is designed for long- and medium-term scheduling of hydro-thermal power system operation, where decisions are made for aggregated regional subsystems or areas. The aggregate area representation allows simulation of large hydro systems with a relatively high degree of detail, thus making the model well suited for comprehensive studies on a national and international scale. © Copyright 2010 IEEE – All Rights Reserved

Kategori

Vitenskapelig Kapittel/Artikkel/Konferanseartikkel

Språk

Engelsk

Forfatter(e)

Institusjon(er)

  • SINTEF Energi AS / Energisystemer
  • Norges teknisk-naturvitenskapelige universitet

År

2010

Forlag

IEEE conference proceedings

Bok

Energy Market (EEM) 2010 7th International Conference on Euoropean Energy Market

ISBN

9781424468386

Vis denne publikasjonen hos Cristin