Til hovedinnhold
Norsk English

Long-term hydro-thermal scheduling including network constraints

Sammendrag

This paper presents a method for treating transmission network bottlenecks in a stochastic hydro-thermal scheduling model. The model is designed for long- and medium-term scheduling of hydro-thermal power system operation, where decisions are made for aggregated regional subsystems or areas. The aggregate area representation allows simulation of large hydro systems with a relatively high degree of detail, thus making the model well suited for comprehensive studies on a national and international scale. © Copyright 2010 IEEE – All Rights Reserved

Kategori

Vitenskapelig kapittel

Språk

Engelsk

Forfatter(e)

Institusjon(er)

  • SINTEF Energi AS / Energisystemer
  • Norges teknisk-naturvitenskapelige universitet

År

2010

Forlag

IEEE (Institute of Electrical and Electronics Engineers)

Bok

Energy Market (EEM) 2010 7th International Conference on Euoropean Energy Market

ISBN

9781424468386

Vis denne publikasjonen hos Nasjonalt Vitenarkiv