Til hovedinnhold
Norsk English

Challenges in the distribution grid development regime for DG integration - the need for predictable plans and arenas for communication

Sammendrag

In Norway, distribution companies experience that the grid regulatory regime, has not developed in line with the pressure stemming from the growth of distributed generation (DG). This paper presents two major non-technical challenges for the distribution companies. Firstly, the lack of incentives to ensure a holistic planning of the grid, and secondly, the communication challenge between the DG owner and the Distribution System Operator (DSO) in terms of information flow and dialogue through the process. Several initiatives have been taken to meet these challenges. However, the problems are still present. The paper seeks to address the existing plans in Norway for DG integration of small scale hydro power and grid development and assesses whether better use and coordination of regional and local plans can reduce the uncertainty faced by the DSOs through providing a more predictable picture of the DG development process for the actors involved.

Kategori

Vitenskapelig Kapittel/Artikkel/Konferanseartikkel

Språk

Engelsk

Forfatter(e)

Institusjon(er)

  • SINTEF Energi AS / Termisk energi
  • SINTEF Energi AS / Elkraftteknologi

År

2013

Forlag

CIRED - Congrès International des Réseaux Electriques de Distribution

Bok

CIRED 2013 Electricity Distribution Systems for a Sustainable Future

ISBN

9781849197328

Vis denne publikasjonen hos Cristin