Til hovedinnhold

Lars Magne Nonås

Seniorforsker

Lars Magne Nonås

Seniorforsker

Lars Magne Nonås
Telefon: +47 416 52 323
Avdeling: Energi og transport
Kontorsted: Bergen

Publikasjoner og ansvarsområder

Publikasjon
https://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1695441

This paper considers the problem of determining the optimal vessel fleet to support maintenance operations at an offshore wind farm. We propose a two-stage stochastic programming (SP) model of the problem where the first stage decisions are what vessels to charter. The second stage decisions are how...

Forfattere Stålhane Magnus Halvorsen-Weare Elin Espeland Nonås Lars Magne Pantuso Giovanni
År 2019
Type Tidsskriftspublikasjon
Publikasjon
https://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1628682

The offshore wind sector has achieved significant cost reductions in recent years. However, there is still work to be done to maintain and surpass these savings across current and future farms. There is increased competition to reduce costs within the industry itself. Additional challenges are fores...

Forfattere McAuliffe Fiona Devoy Lynch Katie Sperstad Iver Bakken Nonås Lars Magne Halvorsen-Weare Elin Espeland Jones Dylan Akbari Negar Wall Graham Irawan Chandra Norstad Inge Stålhane Magnus Murphy Jimmy
År 2018
Type Tidsskriftspublikasjon
Publikasjon
https://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1582025

Operational expenditure (OPEX) is one of the major contributors to the levelized cost of energy (LCoE) for offshore wind farms. To assess different solutions and select the best ones, good models for maintenance and logistics decision support are required. This chapter provides an overview of, and a...

Forfattere Welte Thomas Michael Sperstad Iver Bakken Halvorsen-Weare Elin Espeland Netland Øyvind Nonås Lars Magne Stålhane Magnus
År 2018
Type Del av bok/rapport
Publikasjon
https://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1533274

Maintenance operations at offshore wind farms are challenging due to the offshore element; maintenance technicians and spare parts need to be transported from an onshore port or offshore station to the individual wind farm components in need of maintenance. The vessel resources needed to support the...

Forfattere Halvorsen-Weare Elin Espeland Norstad Inge Stålhane Magnus Nonås Lars Magne
År 2017
Type Tidsskriftspublikasjon
Publikasjon
https://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1392503

In this paper we consider the problem of determining the optimal fleet size and mix of vessels to support maintenance activities at offshore wind farms. A two-stage stochastic programming model is proposed where uncertainty in demand and weather conditions are taken into account. The model aims to c...

Forfattere Stålhane Magnus Vefsnmo Hanne Halvorsen-Weare Elin Espeland Hvattum Lars Magnus Nonås Lars Magne
År 2016
Type Tidsskriftspublikasjon
Publikasjon
https://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1243809

A fleet of vessels and helicopters is needed to support maintenance operations at offshore wind farms. The cost of this fleet constitutes a major part of the total maintenance costs, hence keeping an optimal or near-optimal fleet is essential to reduce the cost of energy. In this paper we study the ...

Forfattere Gundegjerde Christian Halvorsen Ina Blomseth Halvorsen-Weare Elin Espeland Hvattum Lars Magnus Nonås Lars Magne
År 2015
Type Tidsskriftspublikasjon