Til hovedinnhold

Installation of Pre-assembled Offshore Wind Turbine Using a Catamaran Vessel and an Active Gripper Motion Control Method

Installation of Pre-assembled Offshore Wind Turbine Using a Catamaran Vessel and an Active Gripper Motion Control Method

Kategori
Vitenskapelig foredrag
Oppdragsgiver
  • Research Council of Norway (RCN) / 237929
Språk
Engelsk
Forfatter(e)
  • Jingzhe Jin
  • Zhiyu Jiang
  • Sigrid Ringdalen Vatne
  • Zhengru Ren
  • Yuna Zhao
  • Zhen Gao
Institusjon(er)
  • SINTEF Ocean / Energi og transport
  • Norges teknisk-naturvitenskapelige universitet
Presentert på
International Conference and Exhibition on Grand Renewable Energy
Sted
Pacifico Yokohama,
Dato
17.06.2018 - 22.06.2018
Arrangør
ISES
År
2018