To main content

Infinite-cell - International cooperation for the development of cost-efficient kesterite/c-Si thin film next generation tandem solar cells

Photovoltaic (PV) is recognized as one of the main renewable energy solutions for fulfilling the targets defined by the EU Energy Roadmap 2050 and the SET Plan. Most of the current commercial PV devices are formed by single junctions, and more complex device concepts allowing a significant increase in device efficiency (well beyond the theoretical limit in the 30%-33% range) are still mostly limited to expensive III-V technologies.

Contact person

INFINITE-CELL proposes extending the very high efficiency tandem device concepts to emerging thin film PV technologies with high potential for reduction of costs and avoiding the use of critical raw materials. Within this context, the aim is to establish and consolidate an International and Intersectoral Cooperation between 6 EC/AC Academic Institutions (IREC, SINTEF AS, CNRS, UAM, IAP-ASM, HZB), 2 European Companies (SUNGA, MET), and 4 non EC/AC Academic Institutions (MASCIR, BSUIR, UM5, UWC), for the development of cost-efficient photovoltaic tandem devices based in the combination of wide band-gap kesterite absorbers (Cu2Zn(Si,Ge,Sn)(S,Se)4) as top cell, and low cost c-Si thin film as bottom cell. Thanks to the combination of the know-how generated in previous and successful FP7 projects (PVICOKEST (269167) and EUROSUNMED (608593)), INFINITE-CELL targets to develop stacked and monolithically integrated kesterite/c-Si thin film devices with efficiencies of 15% and 20% respectively, using only fully sustainable materials and processes.

This will be possible through de definition of a very impacting Research Plan and a very ambitious Plan of Secondments, where 293 PMs will be exchanged among the partners. The seconded researchers will be immersed in an International and Intersectoral environment for the development and improvement of their networking, scientific, writing, effective communication, and time management skills, warranting the consolidation of a high level scientific community in Advanced Tandem Solar Cell.

SINTEF is a partner in the project.

eu-flagg-100px.jpg

The project has received funding from the European Union's Horizon 2020 research and innovation programme under GA No. 777968. 

http://www.infinite-cell.eu/ 

Key Factors

Project duration

01/11/2017 - 30/10/2021