Western Barents Sea Study 2012
SINTEF Petroleum Research is proud to announce the immediate availability of the regional petroleum systems/basin modelling study "Western Barents Sea Study 2012 (WBS 2012) – Mesozoic play types: evaluation and uncertainty".