To main content

Barriers to prevent and limit acute releases to sea. Environmental risk acceptance criteria and requirements to safety systems

Barriers to prevent and limit acute releases to sea. Environmental risk acceptance criteria and requirements to safety systems

Category
Report/thesis
Abstract
This report summarizes the result from PDS-BIP activity 1. Focus is on non-planned acute releases to sea and the barriers applied during drilling, workover and subsea production in order to prevent such releases. The report discusses requirements to such barriers on two different levels: (1) on a high level in terms of environmental risk acceptance criteria (ERAC) and (2) on a more detailed level in terms of performance requirements for the barriers. The relationship between the overall acceptance criteria and the more detailed performance requirements is also discussed. Oppdragsgiver: Multiclient
Client
  • SINTEF AS / 60S051
Language
English
Affiliation
  • SINTEF Digital / Software Engineering, Safety and Security
  • SINTEF Digital / Mathematics and Cybernetics
Year
2011
Published in
SINTEF Rapport
ISSN
1504-9795
Publisher
SINTEF
Booklet
A20727
ISBN
9788214052275