Predicting excavation methods and rock support: a case study from the Himalayan region of India

Abstract

The Tapovan Vishnugad hydropower project(4x130 MW) in the Himalayan region of India, has been used as a case study to compare the problems and costeffectivenessof a TBM or drill and blast excavation of the headrace tunnel and to assess the rock support measures for the powerhouse cavern. The NTH time and cost prognosis model indicated that the TBM would give a better weekly advance rate and unit excavation cost for the headrace tunnel. The Phase 2 finite element numerical modeling tool and the Hoek–Brown failure criterion were used to analyse the stresses and displacements likely to be experienced in the underground excavations. The rock support determined was compared with that indicated using the Q-method. The work has shown that numerical modeling can prove very useful in supplementing the results, provided the input parameters are accurate and take into account both direct measurements and judgment based on experience of the actual ground conditions.

Category

Academic article

Language

English

Author(s)

  • Sharad Chandra
  • Bjørn Nilsen
  • Ming Lu

Affiliation

  • Norwegian University of Science and Technology
  • SINTEF

Year

2010

Published in

Bulletin of Engineering Geology and the Environment

ISSN

1435-9529

Publisher

Springer

Volume

69

Issue

2

Page(s)

257 - 266

View this publication at Cristin