To main content

Projecting the future cost of PEM and alkaline water electrolysers; a CAPEX model including electrolyser plant size and technology development

Abstract

The investment costs of water electrolysis represent one key challenge for the realisation of renewable hydrogen-based energy systems. This work presents a technology cost assessment and outlook towards 2030 for alkaline electrolysers (AEL) and PEM electrolysers (PEMEL) in the MW to GW range taking into consideration the effects of plant size and expected technology developments. Critical selected data was fitted to a modified power law to describe the cost of an electrolyser plant based on the overall capacity and a learning/technology development rate to derive cost estimations for different PEMEL and AEL plant capacities towards 2030. The analysis predicts that the CAPEX gap between AEL and PEMEL technologies will decrease significantly towards 2030 with plant size until 1–10 MW range. Beyond this, only marginal cost reductions can be expected with CAPEX values approaching 320–400 $/kW for large scale (greater than 100 MW) plants by 2030 with subsequent cost reductions possible. Learning rates for electrolysers were estimated at 25–30% for both AEL and PEMEL, which are significantly higher than the learning rates reported in previous literature.
Read the publication

Category

Academic article

Language

English

Affiliation

  • SINTEF Industry / Sustainable Energy Technology
  • Hystar AS

Year

2022

Published in

International Journal of Hydrogen Energy

ISSN

0360-3199

Volume

47

Issue

90

Page(s)

38106 - 38113

View this publication at Norwegian Research Information Repository