 
    - Authors
- Aina Benedikte Kristin Jordal
- Heidi Seglem
- Year
- 2020
 
     
     
     
     
     
    A description is provided of the legal/regulatory situation, as of early December 2021, for CO2 transport from Sweden/Preem AB to Norway/Northern Lights. CO2 transport from Sweden to Norway for the purpose of geological storage under the seabed is since 2019 legal, thanks to the provisional...
 
    The CCS Midt-Norge project phase 1 has been a collaboration between Franzefoss Minerals, Statkraft Varme, Elkem Thamshavn, Wacker Holla Metall, Equinor Tjelbergodden and SINTEF. CO2 emissions from the industries in the project are around 1.5 Mt/year. Power consumption for capturing and liquefying...
 
    Eramet Norway Sauda, Hydro, Gassco/Equinor and Haugaland Næringspark (HNP) have joined forces in a CCS cluster to evaluate benefits from cooperating on transport of captured CO2 to a storage terminal. Total CO2 emissions in the cluster were in 2022 1.5 million tonnes, which can be expected to...
 
    Rapporten gjør en etterevaluering av en investering på 1,7 milliarder (løpende kroner) i nytt togradiosystem (GSM-R) i Norge i perioden 2003-2008. Kriteriene er produktivitet i utbyggingsfasen, effekter av investeringen (måloppnåelse), ytterligere virkninger, fortsatt relevans, løsningens...
 
    Denne rapporten oppsummerer funn og analyse fra CLIMIT idéstudie «Haugaland CCS». Studiet har tatt utgangspunkt i hydrogenproduksjon fra naturgass med CO2-fangst ved Haugaland Næringspark, og kartlagt potensiell regional bruk av hydrogen i tillegg til stor-skala eksport. Hydrogen for avkarbonisert...