Time to Failure Testing of Model HV XLPE Cables in Salt Water at High Electrical AC Stress and Temperature

Abstract

Installation of high voltage (66 kV) rather than medium voltage (36 kV) inter-array cables for bottom fixed and future floating wind farms reduces the number of cable strings entering a platform, reduces system losses, reduces the overall cable length and the number of substations. All together this will result in a significant overall cost benefit. These developments in offshore renewables as such have called for new cost-effective and reliable high voltage subsea cable designs. The new designs include so-called wet designs allowing water molecules to enter the cable core during service. Time to failure (TTF) testing can provide data to empirically model the service lifetime of the cables at a lower service stress. For high voltage cables, the needed electrical stress during TTF testing can be very high, and there are several challenges then to overcome when performing such testing in seawater. This includes challenges e.g. related to the test-set-up to avoid premature breakdowns at the terminations, or to avoid anomalies at the water surface due to non-radial temperature and diffusion gradients, or in the insulation due to much higher electrical stress in the insulation during testing than in service. This paper presents initial results to facilitate a TTF test set-up and program to model high voltage cable cores soaked in salt water and subjected to a very high electrical stress and temperature. A TTF test of model HV subsea cables using medium voltage XLPE cores was undertaken at a high stress of 30 kV/mm at the conductor screen. From this test it is shown that the modified termination system had a high breakdown stress and inception voltage for partial discharges which was necessary to withstand the high voltage stress of about 100 kV for a long time during the TTF test. The temperature calculations have shown that the anomalous wet ageing conditions occurring close to the hot water-air interface must be avoided as it could cause non-steady anomalous wet ageing strongly accelerating the water tree growth. The heated air system included in the set-up resulted in no anomaly temperature conditions nor any excess ageing phenomena at this interface. All breakdowns occurred in the active/wet sections of the cable, and the mean time to failure (Weibull eta) at 30 kV/mm was about 116 days. Short vented water trees appeared both at the conductor and insulation screen with about the same length and appearance despite the higher electrical field at the conductor screen. This indicate that the electrical field at the conductor screen did not accelerate the length of the vented water trees. However, a significant higher density of bow-tie trees was detected close to the conductor screen than 1 close to the insulation screen. Future work includes TTF testing at other field stresses, where also a sudden death approach to limit the test time will be considered.

Category

Academic chapter

Language

English

Author(s)

Affiliation

  • SINTEF Energy Research / Energy Technology
  • Nexans Norway AS

Year

2022

Publisher

CIGRE (Conseil international des grands réseaux électriques)

Book

CIGRE Session Proceedings 2022

ISBN

9780000000019

Page(s)

10955 - 10955