
Info-blad Magazine
Information about components and equipment
Information about components and equipment
When the proposed HVDC links from southern Norway to the Netherlands and Germany start operation, the total exchange capacity to the Continent will increase to about 2800 MW from the four HVDC terminals located within a geographical distance of...
The Norwegian GIS User Group deals with issues related to operation and maintenance of the 90+ GIS installed in the Norwegian 145, 300 and 420 kV power transmission grids.