Til hovedinnhold

Rimmert van der Kooij

Dr.gradsstipendiat

Rimmert van der Kooij

Dr.gradsstipendiat

Rimmert van der Kooij
Telefon: 451 34 592
Mobil: 451 34 592
Avdeling: Arbeids- og næringsliv
Kontorsted: Trondheim

Publikasjoner og ansvarsområder

Publikasjoner

Publikasjon

The effect of temporary speed restrictions, analyzed by using real train traffic data

http://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1380942

This paper studies the effect of temporary speed restrictions (TSR) in railways. We present a method for analyzing the effect of TSR. TSR, or slow orders, are imposed on the railway to ensure safe use of the infrastructure. We have documented that TSRs give variations in the running times for trains...

Forfattere van der Kooij Rimmert Landmark Andreas D. Seim Andreas Røsland Olsson Nils
År 2017
Type Tidsskriftspublikasjon
Publikasjon

Connecting Business Processes and Sensor Data in Proactive Manufacturing Enterprises

http://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1446699

Real time sensor data is used often to monitor and control industrial applications. Such data is used to detect unexpected events and to take timely action to prevent industrial accidents or breakdowns. We introduce the concept of proactive sensing enterprises. The EU ProaSense project explores the ...

Forfattere Petersen Sobah Abbas van der Kooij Rimmert Puhar Primoz
År 2016
Type Del av bok/rapport
Publikasjon

Time Elasticity - who and what Determines the Correct Project Duration?

http://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1390145

Management of time and progress is a key element in achieving project success. In a classical time-cost-quality division, determining the correct duration of the project has obvious benefits and drawbacks for cost and quality. Generally, it is thought that cost increases at either end of the duratio...

Forfattere Johansen Agnar Landmark Andreas D. Olshausen Fredrick van der Kooij Rimmert Skappel Sidsel
År 2016
Type Tidsskriftspublikasjon
Publikasjon

Simulation framework to analyze operating room release mechanisms

http://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1186358

The block time (BT) schedule, which allocates Operating Rooms (ORs) to surgical specialties, causes inflexibility for scheduling outside the BT, which negatively affects new surgeons, new specialties, and specialties that have fluctuation in the number of surgeries. For this inflexibility, we introd...

Forfattere van der Kooij Rimmert Mes Martijn R.K. Hans Erwin W.
År 2015
Type Tidsskriftspublikasjon
Publikasjon

Investigating effects from Temporary Speed Restrictions

http://www.sintef.no/publikasjoner/publikasjon/?pubid=CRIStin+1176095

Temporary speed restrictions (TSR) imposed in railway infrastructure is an important safety measure where circumstances make it necessary to temporarily restrict the speed of trains to less than the normally permitted speed. These circumstances span events such as planned engineer works/maintenance ...

Forfattere van der kooij Rimmert Olsson Nils Landmark Andreas D. Seim Andreas Røsland
År 2014
Type Konferansebidrag og faglig presentasjon
Vis alle publikasjoner hos Cristin