Til hovedinnhold
Norsk English

Asset magagement of wood pole utility structures

Sammendrag

This paper describes two probabilistic approaches for evaluating the economic impacts of alternative maintenance strategies, design strategies (design load), and compensation fees for undelivered energy. The first approach is based on simulating as function of time the statistical expected value of the number of pole replacements in each year due to climatic damage and maintenance replacements at regular inspection intervals. The second approach calculates the number of failed poles due to single large storms (wind, ice). Calculated examples show that the introduction of compensation fees for undelivered energy gives a strong incentive to carry out live line maintenance, and to design and construct mechanically stronger lines.

Kategori

Vitenskapelig artikkel

Språk

Engelsk

Forfatter(e)

Institusjon(er)

  • SINTEF Energi AS / Energisystemer

År

2005

Publisert i

International Journal of Electrical Power & Energy Systems

ISSN

0142-0615

Forlag

Elsevier

Årgang

27

Hefte nr.

9-10

Side(r)

641 - 646

Vis denne publikasjonen hos Cristin