Integrating Timetabling and Crew Scheduling at a Freight Railway Operator

Sammendrag

We investigate to what degree we can integrate a Train Timetabling / Engine Scheduling Problem with a Crew Scheduling Problem. In the Timetabling / Engine Scheduling Problem we determine for each demand a specific time within its time window when the demand should be serviced. Furthermore, we generate engine duties for the demands.
In our solution approach for the overall problem, we first obtain an optimal solution for the Timetabling / Engine Scheduling Problem. When solving the Crew Scheduling Problem, we then exploit the fact that numerous optimal, and near optimal solutions exist for the previous problem.
We consider all these solutions that can be obtained from the optimal engine schedule by shifting the demands in time, while keeping the order of demands in the engine duties intact.
In particular, in the crew scheduling stage it is allowed to re-time the service of demands if the additional cost is outweighed by the crew savings. This information is implemented in a mathematical model for the Crew Scheduling Problem. The model is solved using a column generation scheme.
We perform computational experiments based on a case at a freight railway operator, DB Schenker Rail Scandinavia, and show that significant cost savings can be achieved.
Les publikasjonen

Kategori

Vitenskapelig artikkel

Oppdragsgiver

  • Research Council of Norway (RCN) / 227071

Språk

Engelsk

Forfatter(e)

  • Lukas Bach
  • Twan Dollevoet
  • Dennis Huisman

Institusjon(er)

  • SINTEF Digital / Mathematics and Cybernetics
  • Aarhus Universitet
  • Erasmus Universiteit Rotterdam

År

2016

Publisert i

Transportation Science

ISSN

0041-1655

Forlag

Institute for Operations Research and the Management Sciences (INFORMS)

Årgang

50

Hefte nr.

3

Side(r)

878 - 891

Vis denne publikasjonen hos Cristin